Product Used:
2mm thickness of SNTZ-100 aerogel middle layer coating.
Environment Condition:
Cement wall, and the outside layer of basement has applied waterproofing materials.
Request:
Prevent mold on basement walls caused by condensation.
Specific construction plan:
The construction sequences from the cement wall are as follows:
- Completely clean up the wall. Make sure there is no dust on wall.
- Use alkali resistant primer or other material to solidified the wall.
- Apply 2mm thickness SNTZ-100 aerogel medium coating using brush or air compressor
- Sealing primer.
- Interior wall finish paint.
Conclusion:
The construction is convenient, the effect is obvious, and the thermal insulation effect is improved at the same time.
Photos of construction site: